Traffic Improvements

Our beautiful town of Boerne consistently receives honors on “Top Places to Live” lists as an ideal destination for families, retirees and businesses. As a result, the rapid rate of growth in residential, commercial and mixed-use development has resulted in the need for considerable traffic improvements. We visited with Kendall County and TxDOT to learn what’s in store for our roadways.

traffic

I-10 CORRIDOR

 

Area: I-10 at Dominion Drive to Ralph Fair Road/FM 3351

Scope of Project – Phase One:

• Converting existing two-way frontage roads between Boerne Stage Road and Ralph Fair Road to one-way

• Replacing overpass at Ralph Fair Road

• Reconfiguring entrance and exit ramps

• Intersection improvements at Ralph Fair Road

• Turnarounds at Ralph Fair Road

• Sidewalks and wide shared lanes for bicycles

Construction Dates:

Begin Summer 2013, End Summer 2015

 

Scope of Project – Phase Two:

• Converting existing two-way frontage roads between Dominion Drive and Ralph Fair Road to one-way

• Adding new turnarounds at Boerne Stage Road and Dominion Drive

• Operational improvements at Boerne Stage Road and necessary construction of ramp reconfigurations

Construction Dates:

Begin Fall 2014, End Summer 2016

 

Area: I-10 between Ralph Fair Road/FM 3351 and Fair Oaks Parkway

Scope of Project – Phase One:

• Converting existing two-way frontage roads to one-way

• Constructing a new I-10 overpass at Old Fredericksburg Road/Buckskin and adding four new ramps

• Reconfiguring entrance and exit ramps

Construction Dates:

Begin Late 2015, End 2018

 

Scope of Project – Phase Two:

• Constructing a new 5-lane bridge at Fair Oaks Parkway

Construction Dates:

Begin Late 2016, End Early 2018

 

Area: I-10 at Scenic Loop Road

Scope of Project:

• Reconstructing main lanes and overpass bridges

• Widening all approaches for improved operations

Construction Dates:

Begin Early 2016, End 2018

 

Area: I-10 West SH46/Bandera Road

Scope of Project:

• Construction of I-10 frontage road between SH46/Bandera Road and Christus Parkway

• Reconfiguring entrance ramps

• Intersection improvements at SH46/Bandera Road

Construction Dates:

Begin Spring 2015, End Fall 2015

 

Area: I-10 Managed Lanes between

Ralph Fair Road/FM3351 and La Cantera Parkway

A managed lane operates separately from the general purpose mainlanes and incorporates a combination of pricing strategies, vehicle eligibility and access control. The managed lanes will be added to approximately 5.7 miles of the I-10 corridor. The number of existing general purpose lanes will remain, and the use of managed lanes will involve a choice: utilized free of charge by mass transit, military, emergency responders and registered vanpools – all others would pay a toll.

Scope of Project:

• Expanding I-10 to a total of eight lanes (four in each direction)

• The additional four lanes would be managed lanes (two in each direction)

• Constructing entry and exit access points in each direction in the vicinity of Dominion Drive

• Existing general purpose (non-toll) lanes will remain

Construction Dates:

Begin Late 2016 to Early 2017, End 2020

 

BOERNE

 

Area: Herff Road

Scope of Project – Phase One/Widening Project:

• Constructing two southbound lanes and two northbound lanes with a center median between SH46/River Road and Old San Antonio Road

• Constructing a new bridge over Cibolo Creek to provide for the two northbound lanes

Construction Dates:

Begin December 2014, End Summer 2015

 

Scope of Project – Phase Two/Extension Project:

• Constructing two southbound lanes and two northbound lanes with a center median between Old San Antonio Road and US Business 87/South Main Street (between Wal-Mart and Dog & Pony Grill)

• Constructing a new bridge over Menger Creek for both southbound and northbound lanes

Construction Dates: Pending

 

Area: SH46/River Road at Plant Avenue – Pedestrian Safety Improvements

Scope of Project:

• Construction of new crosswalk, curb extensions and illumination

• Proposed construction of Rectangular Rapid Flashing Beacons (RRFBs) and Pedestrian Hybrid (HAWK) Signals

Construction Dates: Pending

 

Area: US Business 87 and SH46 

Pavement Improvements

Scope of Project:

• SH46 from US Business 87 to Boerne City Park

• SH46 from I-10 to US Business 87

• US Business 87 from I-10 North to South

Construction Dates: Pending

You Might Also Enjoy....

Staff Profile

Christopher Krotke

My 30 years in hospitality, progressing through the ranks into leadership roles, have fully prepared me for this position. Over the past decade, I’ve worked in exclusive private clubs and high-end private dining environments across Nevada, California and Texas, where attention to detail, consistency and elevated service are essential. Every role has contributed to my ability to lead teams, refine operations and deliver exceptional experiences.

Read More »
Manager's Message

Celebrating Excellence at Cordillera Ranch

The first quarter of the year brought outstanding dedication, teamwork and service across our community, and we’re proud to recognize our Q1 C-a-Star recipients who embody the spirit of Cordillera Ranch — delivering exceptional experiences, supporting their teams, and setting a standard of excellence that inspires us all. Their hard work doesn’t just keep our operations running smoothly; it elevates the entire Ranch experience for members, guests and colleagues alike.

Read More »
Golf

The Team Driving the Golf Experience at Cordillera Ranch

As the new Director of Golf at The Clubs of Cordillera Ranch, I couldn’t be more excited to work alongside this exceptional Golf Operations and Instructional Team. From day one, their experience, passion for the game and genuine commitment to our members have stood out. Whether you’re sharpening your skills, trying something new or simply taking in the beauty of the course, this team is here to support golfers of every level with enthusiasm and care.

Read More »
Club Highlights

Celebrating Two Decades of Community and Club Excellence

Celebrating the 20th anniversary of The Clubs of Cordillera Ranch was something our team did not take lightly. We wanted to create an event worthy of honoring a Club we all love and call home — something the owners would be proud of and members would remember for years to come.

Read More »